8.3 REPAIRS AND MAINTENANCE
В In 2003, the repairs and maintenance program for all categories of
principal equipment was implemented in full.
During the year, repairs were carried out on generators with an aggregate capacity of
40,900 MW, power boilers with the steam capacity of 169,700 t/h, hot-water boilers with a
total heat capacity of 10,200 Gcal/h; 722.5 km of heating network pipelines were replaced.
In 2003, the volume of repairs at energy companies located in the problem areas increased,
which enabled the companies to better prepare for the autumn-winter season.
Results of repairs and maintenance program for power plants and
heating networks of RAO "UES of Russia" in 2003
|
|
| Kind of equipment |
Unit of measurement |
Provided by program |
Completion |
Completion, % |
|
| Turbines |
thousand MW |
40.7 |
40.9 |
100.5 |
| Power boilers |
thousand t/h |
169.3 |
169.7 |
100.2 |
| Hot-water boilers |
thousand Gcal/h |
9.6 |
10.2 |
106.3 |
| Trunk heat networks (replacement) |
km |
628.9 |
722.5 |
115.4 |
|
All enterprises of RAO "UES of Russia" obtained their
2003/2004 winter readiness passports in due time. Besides, the companies started to use
the repairs system based on "operating time", which has helped to reduce the
number of major repairs and mid-life overhauls in the companies.
In 2003, materials and equipment procurement on a tendering basis were
widely used the repairs and maintenance activities: 7,199 procurement tenders were held.
Energy companies were able to reduce the number of their own repair
personnel. Besides, the share of repairs and maintenance work done on a contractual basis
grew to 62.4% in 2003 from 39% in 2001.

|